‹ All calculators

Prime Cost

The number that runs your P&L.

Prime cost = COGS + total labor. Full-service targets often sit at 60–65% of sales; QSR runs lower.

Total COGS

$34,500.00

Total labor

$27,200.00

Prime cost %

64.3%

Prime cost (CAD)

$61,700.00